To the news list

Brother Residential Development in Kyiv: August Construction Update

September 03, 2026

Construction of Stage 1 is continuing at the Brother Residential Development site.

In Section A1, reinforcement works are under way for the first-floor slab.

In Section A2, construction of the reinforced concrete frame of the residential floors is continuing. The vertical structural elements of the second floor have already been completed, and preparations are under way for concreting the second-floor slab and the vertical structural elements of the third floor. Masonry works have also commenced on the technical floor.

In Section A3, construction of the building’s reinforced concrete frame has been completed. Masonry works are currently progressing at pace, and the manufacture of metal-plastic windows has also commenced.

In Section AP, the technical-floor slab has been concreted in the first part of the stylobate. The vertical structural elements of the technical floor are currently being constructed in the second part.

At the same time, installation of the external water supply, foul drainage and surface water drainage networks is continuing across the construction site.

Construction works at the Brother Residential Development are progressing ahead of the planned schedule.

Brother is a contemporary residential neighbourhood near Lake Soniachne in Kyiv, where comfort extends well beyond your own apartment. The development features a pedestrian promenade, an activity park, sports and children’s areas, running and cycling routes, recreational spaces and its own commercial amenities. Everything you need for different lifestyles is close at hand: spend more time with your family, exercise, relax, take a walk or run everyday errands without having to venture far from home.

And now, property at the Brother Residential Development is available on particularly attractive terms.

Until 15 October, buyers can take advantage of a flexible instalment plan with no additional costs, with an initial payment starting from 30% and a 5% discount applied to the amount of the initial payment. The payment period can also be extended until six months after the completion of construction and installation works.

These terms apply to apartments, parking spaces and commercial premises. A 5% discount is also available when paying 100% of the purchase price upfront.

For details, visit a RIEL sales office in Kyiv: 17K Dniprovska Embankment (Bereh Dnipra Residential Development) or 5B Rostyslavska Street (Elyseum Residential Development).

Call us on: +380 73 298 41 19.

Brother
We will call you back, advise, select the best options
Thank you for your application! We will contact you shortly.