
Construction of the second stage of the Nordica Residence business-class residential development in Kyiv is nearing completion. In Buildings 2 and 3, façade works and the installation of glass terrace balustrades are nearing completion. Preparations are currently under way for cleaning works and the submission of documentation for the commissioning of the buildings.
In Car Park 2, installation of the ventilation and smoke extraction systems is 97% complete, while the sprinkler fire suppression system is 85% complete. Work on the floor covering has also begun.

Nordica Residence is a business-class residential development in Kyiv’s Pechersk District, where contemporary architecture meets thoughtfully designed infrastructure. Residents will benefit from a car-free courtyard, a rooftop lounge area, spaces for working and socialising, and a full-day nursery. The first phase of the development has already been commissioned, with the second phase scheduled for commissioning by the end of 2026.
Particular attention has been paid to self-sufficiency at Nordica Residence. In the event of power cuts, a backup power supply will ensure the operation of lifts, water supply systems, access control and CCTV systems. Emergency lighting in communal areas and power to sockets in these areas will also be maintained. These solutions are designed to preserve residents’ comfort and ensure the reliable operation of the building’s key systems, even during disruptions to the electricity supply.
Only 9% of apartments in the development remain available. Those considering purchasing a home at Nordica Residence are therefore encouraged to explore the available layouts and choose their future home now.
To find out more about the apartments currently available, please contact RIEL’s sales offices:
- Kyiv: 17K Dniprovska Embankment (Bereh Dnipra residential development) and 5B Rostyslavska Street (Elyseum residential development);
- Lviv: 116 Bohdana Khmelnytskoho Street and Stryiska Street (2 Persenkivka).





