Construction of Stage 1 of the Brother Residential Complex is actively underway. The building’s structural framework is already taking shape on site, with work progressing simultaneously across several sections.
In Section A1, waterproofing has been completed and the foundation slab has been poured. Installation of the technical floor framework has commenced.
In Section A2, preparation works for the foundation slab have been completed, and waterproofing operations are now in progress.
In Section A3, the technical floor framework (vertical elements and floor slab) has been completed, and installation of vertical elements of the basement level is ongoing.
Tower crane No. 1 has already been installed on the construction site, and installation of tower crane No. 2 is currently underway.
Brother Residential Complex is about living in balance: the energy of the city combined with a sense of calm in your own space. A thoughtfully designed environment, car-free courtyards, pedestrian routes, and well-planned daily living scenarios create comfort every day.
Now is the optimal time to choose: a range of layouts is currently available at attractive early-stage prices. This is an opportunity to purchase an apartment with an excellent price-to-quality ratio before further price increases.
The location adds even more value: a well-established neighbourhood with full infrastructure — schools, kindergartens, shops, transport links, and recreational areas are all nearby. In addition, Lake Sonyachne is within close proximity, offering opportunities for waterside relaxation during the warmer months.
We invite you to visit our sales offices — we will help you find the perfect option tailored to your needs:
Dniprovska Embankment, 17K or 5B Rostyslavska Street (1st floor), Kyiv
+38 073 298 41 19