Active construction is ongoing at the Big Ben Residential Complex site in Frankivskyi District, Lviv.
Section A1: The slab for the seventh floor has been completed, and monolithic parapets on the roof are currently being installed.
Section A2: Roofing works are in progress, and installation of window systems has commenced.
Sections A1 and A2: Masonry works for walls and partitions continue in both commercial and residential premises.
Section A3: Construction of the second-floor columns has been completed, and preparations are underway for the installation of the floor slab.
Section A4: Construction of vertical monolithic structures of the car park is ongoing. Waterproofing and drainage works for the external walls have also begun.
Section AC6: Foundation works have been completed, and construction of vertical monolithic structures of the car park is currently in progress.
The Big Ben Residential Complex is being developed as a contemporary urban living environment, combining thoughtful architecture with well-designed infrastructure.
The project includes an underground car park with electric vehicle charging stations, dedicated storage spaces for prams and bicycles, as well as a spacious lobby featuring a concierge service and designated parcel collection areas.
Particular attention is given to the organisation of the internal environment. Residents will benefit from landscaped green areas, a promenade, and relaxation spaces — including those on gallery levels — all contributing to a comfortable and welcoming atmosphere for everyday living.
At the same time, sales have opened for Stage 2 in the residential complex — a new stage in the development that expands the range of available options and allows buyers to select optimal layouts at an early stage. Sales office contact details are available via the link.