To the news list

Mistechko Pidzamche. Vezha Residential Development in Lviv: July Construction Update on Stage Three

August 18, 2026

Construction and finishing works are continuing on the third phase of the Mistechko Pidzamche. Vezha Residential Development in Lviv.

In Section 7.1, façade works are nearing completion. Preparations are also under way for the installation of water supply, heating and electrical systems within the floor structure.

In Section 7.2, tiling in the communal areas has been completed, and preparations are under way for the installation of apartment entrance doors.

In Section 7.3, installation of the internal gas supply system is continuing.

Between Sections 7.2 and 7.3, on the side facing the first and second stages of the Vezha Residential Development, landscaping works are continuing.

In Section 8.1, lift installation is under way, while installation of the railings along the open-air passageways has been completed.

The Mistechko Pidzamche. Vezha Residential Development in Lviv is a contemporary residential neighbourhood close to the city centre, where architecture, landscaped surroundings and on-site infrastructure come together to create a comfortable environment for everyday living. Recreational areas, thoughtfully designed communal spaces and commercial premises create a neighbourhood where everything residents need is close at hand.

For those considering purchasing a home in the development, prices currently start from $1,200 per sq m, with apartments available from $100,320.

For more information about available layouts and current purchase terms, please contact RIEL’s sales offices.

  • Kyiv: 17K Dniprovska Embankment (Bereh Dnipra Residential Development) or 5B Rostyslavska Street (Elyseum Residential Development);
  • Lviv: 116 Bohdana Khmelnytskoho Street or Stryiska Street (2 Persenkivka).
Pidzamche. Vezha
We will call you back, advise, select the best options
Thank you for your application! We will contact you shortly.