To the news list

Mistechko Pidzamche RC: in the first stage of the Vezha complex, finishing of the common facilities is completed in all sections

March 07, 2024

Real Estate Corporation RIEL reports that the construction of the Mistechko Pidzamche Residential Complex is actively continuing. In the first stage of the Vezha complex, in all sections the common facilities have been completed (except for the first floor). The installation of decorative ceilings and landscaping is in progress.

In the second stage, in sections 5.1, 6.1, the finishing of the common facilities is also completed (except for the first floor), in sections 4.1, 4.2, 4.3, 4.4 these works are underway. Also, the builders report that they have completed the installation of an internal fire water supply system, and are currently installing a fire alarm system.

In the third stage, in section 7.1, the floor slab of the eighth floor is being poured, in section 7.2, the blockwork of the eighth floor is being carried out.

In the fifth stage, the façade is being finished.

You can choose the floor and layout, as well as other details about conditions for purchasing apartments in Mistechko Pidzamche RC in our sales department. Contacts are available at the link.

Pidzamche. Vezha
We will call you back, advise, select the best options
Phone number *
Thank you for your application! We will contact you shortly.