
RIEL Real Estate Corporation continues active construction work on the site of the Brama. Mistechko Pidzamche Residential Complex.
In the second stage, the installation of the sloping roof in section B-1 has been completed, as well as the laying of power and internet cables in all sections. In section B-2, the installation of metal roof has begun, and preparations are underway for the installation of floor screeds in common areas.

In the third stage, in section B-4, the roof blockwork, installation of ventilation ducts and chimney systems, as well as the construction of external walls and internal partitions have been completed. In section B-3, the fifth floor slabs are being poured. At the same time, façade work is underway in section B-6.

Mistechko Pidzamche is a modern residential neighborhood near the historic center of Lviv, developed with respect for traditional urban architecture and the latest standards of comfort.
The project includes several construction stages with well-thought-out layouts, cozy courtyards, modern infrastructure, and comfortable living spaces.
For more information and consultations, please contact our sales department using the contact details provided on our website.

